Removing rubble from a renovation looks like a simple item, but it is subject to construction and demolition waste management regulations that go beyond "ordering a skip".
Skip: municipal permit if it occupies the public road
If the skip is placed on the street, most councils require a public-road occupation licence, with its corresponding fee and, in some areas, time restrictions on placement and removal. This procedure and its cost should be included in the quote, not left as a surprise.
Authorised waste manager
Construction waste must be delivered to an authorised manager, who issues a waste management certificate, a document that may be required by the council or requested by the client themselves to comply with the construction and demolition waste regulations in force.
Waste separation by type
On jobs of a certain volume, the regulations require certain waste (metals, wood, plastic, hazardous waste such as asbestos remains) to be separated rather than all mixed in the same skip, which may mean more than one skip or differentiated handling depending on the type of material removed.
Need to quote waste management for a renovation? Do it in PresupuestoYa.
Want to calculate this quote automatically?
PresupuestoYa calculates materials, quantities and total cost in minutes, for this and 19 other trades.
Create a free quote →