Bathroom renovation is one of the projects where the most different trades converge in very little space, and forgetting a single item in the initial quote is common if a complete checklist isn't followed.
Demolition and stripping out
Removal of existing sanitaryware, tiling and flooring, plus waste handling and removal, is always the first item, and its cost varies depending on whether you have to chip back to the brick or only the finish layer.
Installations
Plumbing (new routing if the sanitaryware layout changes), electrics (light points, shaver socket with specific wet-area protection) and waterproofing of the shower tray and water areas are essential items before any finish.
Finishes
Wall tiling, floor tiling, new sanitaryware (toilet, washbasin, shower tray or bath), screen, taps, bathroom furniture and mirror make up the visual bulk of the renovation, each with its own price range depending on the range chosen.
Details often forgotten
Extractor fan (often mandatory in windowless bathrooms), access grilles for hidden installations, and the final site clean itself are small items that, added together, represent a percentage of the quote that shouldn't be missing.
Need to quote a full bathroom renovation without leaving items out? Calculate it in PresupuestoYa.
Want to calculate this quote automatically?
PresupuestoYa calculates materials, quantities and total cost in minutes, for this and 19 other trades.
Create a free quote →