Coordinating several trades in a renovation: who goes first and why

A bad order of trades on site creates rework and delays. A practical guide to the usual order and the most critical coordination points.

PT
PresupuestoYa Team
27 July 2026 · 1 min read

When a multi-service technician or a contractor coordinates several trades on the same renovation, the order in which each enters the site is as important as the quality of each professional's individual work.

Usual order of work

Demolition and rough masonry first, followed by electrical and plumbing (with partitions still open), then plasterboard or new partitioning, tiling and flooring, painting, and finally finishing carpentry (doors, skirting) and final clean-up. Changing this order almost always creates duplicated work.

Most critical coordination points

The electrician and plumber passing through before partitions are closed is the point where coordination most often fails: if one trade finishes and closes up before the other has passed, it has to be opened again. Just as critical is that the tiler does not start before the bathroom waterproofing has fully cured.

Why a single person in charge of coordination saves money

When the client hires each trade separately with nobody coordinating the order, the risk of miscoordination soars. Offering coordination as part of the quote (even if each trade is subcontracted) provides real added value and cuts dead time on site.

Need to quote a renovation with several coordinated trades? Calculate it in PresupuestoYa.

Share

Want to calculate this quote automatically?

PresupuestoYa calculates materials, quantities and total cost in minutes, for this and 19 other trades.

Create a free quote →