Masonry — page 2
Brickwork, flooring, wall finishes and demolition.
What to check before breaking out flooring or a suspended ceiling, and when tiling over tiling is better than demolishing the existing covering.
Average hourly rate of a skilled floor layer, why large format and patterned layouts take longer, and how a second pair of hands helps.
Average hourly rate of a skilled demolition worker and assistant in Spain, and which specific task benefits most from an assistant.
Average hourly rate of a skilled tiler, why large format takes longer, and which tasks benefit most from an assistant.
Average hourly rate of a skilled bricklayer and labourer, how many m² of floor tile or wall tiling are laid per day and what waste management to include in the quote.
How to calculate self-levelling compound by layer thickness, and why the underlay under wood flooring affects impact-noise insulation.
How many 60x60 tiles a plaster suspended ceiling takes, when to choose continuous plasterboard instead and what insulation to use between the slab and the ceiling.
How to calculate cement grout consumption according to the joint width chosen, and when epoxy grout is worth it over cement in damp areas.
What size of spacer to use for each type of tile, and from what format a levelling system is advisable to avoid lippage between tiles.